Village of North Aurora

Non-Motorized Transportation Plan

June 2001

League of Illinois Bicyclists


Table of Contents

Introduction

Why plan for bicycles and pedestrians?
An overall look at North Aurora and the Plan
Planning Approach

Recommended Bicycle Plan

AASHTO Guide
Bikeway Types
Wide Outside (Curb) Lane
Bike Lane
Paved Shoulders
Sidepaths
Trails
Bicycle Maps
Spot Improvements
Table 1 – Spot Improvement recommendations
Figure 1(a) Existing Bicycling Conditions and Proposed Trails - East Sector
Figure 1(b) Existing Bicycling Conditions and Proposed Trails - Central Sector
Figure 1(c) Existing Bicycling Conditions and Proposed Trails - West Sector
Figure 1(d) Existing Bicycling Conditions and Proposed Trails - Far West Sector
Bike Parking

Recommended Pedestrian Plan

Sidewalks
Table 2 – Proposed Sidewalks with Priority
Figure 2(a) Existing and Proposed Sidewalks - East Sector
Figure 2(b) Existing and Proposed Sidewalks - Central Sector
Figure 2(c) Existing and Proposed Sidewalks - West Sector
Intersections and Crosswalks
Other Pedestrian Facilities
Figure 2(a) Existing and Proposed Crosswalks - East Sector
Figure 2(b) Existing and Proposed Sidewalks - Central Sector
Figure 2(c) Existing and Proposed Sidewalks - West Sector

Trail Proposals

Far West Subdivision Trails
White Oak/NICOR corridor
“Mid-County Trail” Connections
ComEd trail
Abandoned Burlington Northern Right-of-way trail
Miscellaneous Trail Links
Illinois 25 trail

Arterial and Collector Road Recommendations

Methodology
Specific Road Recommendations

Funding Opportunities

Illinois Transportation Enhancement Program (ITEP)
Congestion Mitigation and Air Quality (CMAQ)
Illinois Bicycle Path Grant Program
Other Sources

Questions for review of roadwork and developments

Residential Developments
Commercial Developments
Road Projects

Appendix A – Road Suitability for Bicycles
Appendix B – Sidepath Suitability Algorithm
References


Introduction

Why plan for bicycles and pedestrians?

The Village of North Aurora has contracted with the League of Illinois Bicyclists to produce this non-motorized transportation plan. The transportation modes emphasized in this plan will be bicycling and walking. Other user groups and non-motorized modes can usually be accommodated by facilities for cyclists and/or pedestrians.

The overall motivating goals and guiding principles for this work are:

Throughout the country, there is a strong latent demand for better bicycling and pedestrian conditions. People want to be able to walk and bike around town. A bike- and ped-friendly town is associated with a high quality of life and an intangible sense of community. Nationally, sedentary lifestyles and obesity rates have soared in the previous decades, as development patterns and safety concerns have led to near-exclusive dependence on the automobile. National research has shown that 27% of all automobile trips are one mile or less; 40% are two miles or less; and 49% are three miles or less in length1. All of these trips are within reasonable bicycling distance – if a community is designed to make bicycle trips just as easy and convenient as automobile trips. Besides those who bicycle or walk by choice, there are residents – including children, many teenagers, and some low-income workers – who rely on these modes by necessity. The Village of North Aurora is clearly dedicated to providing its citizens with safe alternatives.

This plan takes an overall look at the Village in an attempt to remove barriers to safe, convenient bicycling and walking. Capital improvements including trails, sidewalks, crosswalks, and bicycle racks are prioritized. Recommendations for bike/ped accommodation are described for future roadwork on arterials and collectors. Policies are suggested to ensure that future development encourages bicycling and walking. Described are possible funding sources – most of which give preference to projects that are part of a village plan.

An overall look at North Aurora and the Plan

North Aurora, like other Fox River communities at the edge of Chicagoland, is in the middle of an extended period of growth. Subdivisions are being built on both the east and far west sides. Commercial development is occurring along Randall Road with more being planned along Orchard Road. This new growth is accessible only by arterial roads, and these roads are becoming increasingly busier.

North Aurora is highlighted by the Fox River Trail along the river’s entire west bank and its east bank north of State Street. This popular trail is part of the north-south system that has increased the attractiveness of downtowns along the Fox Valley. Its importance as a transportation corridor would be increased by adding more access points. Also, existing impediments either cause some residents to drive to get to the trail, or discourage them from using it altogether.

In addition to the trail, there are other areas with higher rates of bicycling and walking. Many residents use these modes between the near east side along Butterfield Road to retail areas just west of the river. Many students walk to school –half of Goodwin Elementary children, for example. Some retail and service industry workers walk or bike to jobs along the south Illinois 31 corridor and the retail areas at Oak and Randall Roads.

The original sections of the village, on the near northeast and near west sides, were built without sidewalks. All recent development has been required to include sidewalks with curb cuts, but painted crosswalks are rare.

The North Aurora Police Department reports a negligible number of accidents between motor vehicles and either pedestrians or bicyclists. Incidents have generally been limited to bicycle theft and accidents among trail users. The challenge is to increase accessibility and use of these modes while maintaining the current low accident rates.

PACE provides bus service mostly along the Illinois 31 corridor to downtown Aurora, the towns north of North Aurora, two Metra stations, and a major employer in Addison. PACE has announced that they will be adding bike racks to the front to their buses, so safe access to bus stops becomes important to extend ridership range further into the village.

As North Aurora extends east and west, the Village and Teska Associates, Inc. are studying ways to revitalize the “downtown” Illinois 31 corridor. Part of the revitalization plan includes a “trailhead” at the ComEd right-of-way, including a restaurant/park area and an east-west trail from the Fox River Trail to the west. Development of an east-to-west “ComEd trail” is the top priority of this non-motorized plan. There is a very real potential to connect with Kane County Forest Preserve’s conceptual “Mid-County Trail” to the west and the Illinois Prairie Path’s Batavia Spur (via Aurora) to the east. Besides serving an important east-west need for village residents, this major regional connector trail would make the proposed trailhead area and island park a significant attraction in the Fox Valley.

The ComEd trail and its neighborhood connections will be a major focus of this plan. In general, bicycling and walking conditions to significant destinations – usually along arterial roads – will be emphasized.

Planning Approach

Walking and bicycling are different enough to consider separately in this plan. Since almost everyone walks at some point, pedestrian needs and facilities are commonly recognized. This plan will prioritize a list of missing sidewalks and painted crosswalks according to certain criteria. Additional comments offer other safety improvements for pedestrians.

Since many adults do not bicycle – or only ride recreationally on trails – the needs and facilities for bicycling are not as well known. Besides planning for new trails, this plan specifies improvements for utilitarian bicycling on the road network. Knowledge of the needs and concerns of different levels of cyclists is important to the planning process. The Federal Highway Administration has developed a system of designating three levels of bicycling ability for design purposes2:

Group A – Advanced Bicyclists: Experienced cyclists who can ride under most traffic conditions. Like motorists, Group A cyclists prefer quick, direct access to destinations with a minimum of stops. Often, these conditions are found only on collectors and arterials, and most bicyclists found on these roads are Group A. These cyclists prefer to have sufficient roadway space to eliminate the need for either themselves or a passing motor vehicle to shift position.

Group B – Basic Bicyclists: Casual or new adult and teenage riders who are less confident in their ability to operate in traffic without special provisions for bicycles. Most people fall into this category.

Some will improve to Group A over time. Group B cyclists prefer comfortable access to destinations on bike-friendly roads, on separate bike paths, or on well-defined bike lanes or shoulders along arterials and collectors.


Group C – Children: Pre-teen riders whose bicycling activity is initially monitored by their parents. Their bicycling requires access from residential areas to schools, recreation facilities, and shopping, on quiet residential streets or well-defined bicycle facilities. Before age 10, bike-riding choices are extremely limited and parental supervision is extremely important. While sidewalks are the best choices for such young riders, sidewalks have many problems if promoted for bicycle use by Groups A and B.

The bicycle portion of this plan will target Group A and B bicyclists. The FHWA proposed a set of design treatments based on a two-tier system, with one set recommended as a minimum for all streets and highways (based on the needs of Group A cyclists), and a second set of treatments for routes expected to serve Group B and C cyclists. Planning for the needs of the youngest Group C cyclists will be grouped into the pedestrian section, since their needs are similar.


Recommended Bicycle Plan

AASHTO Guide

This plan recommends a mixture of on-road and trail facilities to provide a comprehensive network of desirable bicycle routes that link the various areas of the Village. The 1999 Guide for the Development of Bicycle Facilities3 by the American Association of State Highway and Transportation Officials (AASHTO) forms the technical basis for the recommendations. The Illinois Department of Transportation recommends that this publication be utilized when developing a bicycle plan4. A summary of the types of bicycle facilities is included below, but all of the engineering design details should be taken from the AASHTO guide. (A copy has been provided to the Village.) The guidelines described by AASHTO are generally recognized by the industry – and the court system – as the standard for bicycle facility design. Following them would be the Village’s best protection from liability concerns.

Bikeway Types

A variety of on-road and off-road bicycle facilities can accommodate bicyclists5,6,7:

Wide Outside (Curb) Lane

Outside lanes that are 14 ft wide may be provided to allow an average sized motor vehicle to pass a bicyclist without crossing over into the adjacent lane. Wide outside lanes are generally considered an appropriate facility for Group A advanced riders on busy urban arterials. “Share the Road” warning signs (standard bicycle warning plate with a subplate stating “Share the Road”) may be used. For retrofit projects where wide outside lanes are to be installed, the roadway may either be physically widened or re-striped to reduce the lane width of inner lanes and increase the width of outer lanes.

Bike Lane

A bike lane is a portion of the roadway designated for use by bicyclists, typically with a width of 4-5 ft. Bicycle lanes serve the needs of all types of cyclists, providing them with their own travel lane on the street surface. They are designated with signage, edge striping, and bicycle icons. On two-way streets, bike lanes are always installed on both sides – two-way bike lanes should not be installed on one side of the street. Regular maintenance by street cleaners is important for bike lanes because of the tendency to collect debris.

Paved Shoulders

Paved shoulders can also serve bicyclists’ needs on streets. While any additional space is beneficial, a 4-6 ft shoulder is preferred. Paved shoulders should be included on both sides of the roadway. In addition to the benefits to bicyclists, paved shoulders can also extend pavement life and provide a motorist breakdown area. Regular maintenance is essential if paved shoulders are to be useful to bicyclists. Also, paved shoulders that include rumble strips can be essentially useless to bicyclists. In most cases, rumble strips are not recommended unless they are designed to provide bicyclists with an adequate amount of space in which to operate.

Most Americans are reluctant to ride bicycles in the absence of designated bike lanes and separated pathways. There are several advantages to bike lanes and paved shoulders. Motorists are less likely to encroach into the adjacent lane when passing a bicyclist riding on a paved shoulder or bike lane. Bicyclists are more likely to ride further from the edge of the roadway in a bike lane or paved shoulder than they are in a wide curb lane. This does not significantly reduce the separation between motorist and bicyclist, but it does increase the distance to the right of the bicyclist that can be used to maneuver around debris. The presence of the stripe separating bicyclists from motor vehicles enhances the comfort level of both, as both vehicles guide off the lane stripe – rather than the other vehicle – in their clearly defined space.

Sidepaths

Sidepaths are trails running immediately parallel to a roadway, like a sidewalk. In the past, bicycle sidepaths were developed to separate cyclists from roadways to reduce opportunities for conflict. It is now widely accepted that bicycle paths parallel to roads or on sidewalks actually cause greater conflicts. For this reason, they are not recommended in most cases.

Sidepath riders are 1.8 times at risk of being involved in a collision with a motor vehicle than cyclists on the street. Wrong-way sidepath riders (those riding against motor traffic) are 4.5 times at risk of being involved in a collision than path riders traveling in the same direction of traffic8. The AASHTO guide describes problems with sidepaths, including3:

A “Sidepath Suitability Algorithm”, included as Appendix B, incorporates many of these issues into a score of a sidewalk or sidepath’s suitability as a bicycle facility. The algorithm can be used to rate current conditions and to plan improvements for existing sidepaths. When a planned sidepath is appropriate, or in cases where on-road facilities are impossible physically or politically, the algorithm can help minimize problems and accident risk.

Trails

Multi-use trails are physically separated from motor vehicle traffic, except at road crossings. Trails are usually built either within an independent right-of-way (such as a utility corridor or abandoned railway), or along easements across private lands. Trails accommodate a variety of users – including pedestrians, bicyclists, and other user groups – for both recreation and transportation purposes. Except for low volume, short segments, paved trails should be 10 feet wide. AASHTO provides extensive trail design guidelines – with road intersections being of particular importance.

Bicycle Maps

The four maps of Figure 1 show the Village’s “Existing Bicycle Conditions and Proposed Trails.” Included in the maps are:

Both the existing bicycle conditions depicted on these maps and the locations of significant destinations help to determine deficiencies and demand. They serve as the basis for prioritizing the proposed bicycle improvements in the “Trail Proposals” and “Arterial and Collector Road Recommendations” sections.

Spot Improvements

Table 1 lists some miscellaneous, very localized improvements that are indicated on the Figure 1 maps as brown asterisks.

Table 1 – Spot Improvement recommendations
1 Sidewalk link from Oak St sidewalk to townhouses
2 Sidewalk connection from Courtyard Village West apartments to bank/strip mall
3 Taper sidewalk's 90 deg turn just west of Oak/Walnut intersection
4 John St access to Fox River Trail
5 Sullivan Rd access to Fox River Trail
6 Just east of bridge, taper sidewalk's 90 deg turn, cut down 18" cement wall
7 Pedestrian crossing signs and crosswalks, maybe raised median refuge
8 Schneider School zone sign – add a flashing light timed for arrival, dismissal
9 Schneider School zone sign – add a flashing light timed for arrival, dismissal
10 Short sidewalk link between Long and Patterson

Bike Parking

Providing secure bicycle parking is a necessity of a useful bicycle system. Investing in bicycle parking will allow people to use their bicycles for transportation purposes and reduce parking in undesirable places. The most important considerations to ensure successful bicycle parking are a good location and a good rack.

A good bike rack provides support for the bicycle frame and allows both the frame and wheels to be secured to the rack with one lock. The most common styles include the inverted “U” and the wave or continuous curve style. Old-fashioned “school racks,” which secure only one wheel, are a poor choice for today’s bicycles. Enclosed bike lockers, high security racks, and storage inside a building are longer-term bike parking options providing additional security and protection from the weather.

The best locations for racks are near main building entrances, conveniently located, highly visible, and, preferably, protected from the weather. Ideally, all multi-family and non-residential buildings should provide at least a few parking spaces. The following sample ordinance is recommended for adoption6:

“All residential uses except single family residential and duplexes, and all non-residential uses, shall provide sufficient bicycle parking facilities consisting of not less than one (1) bicycle parking space for every twenty (20) required automobile spaces, with a minimum of two (2) bicycle parking spaces for any use.”

Bike racks currently exist at a few locations throughout the Village, most noticeably the Activity Center, library, the schools, and a couple of businesses with heavier bicycle traffic. The Chicago Area Transportation Study and Kane County Council of Mayors currently are offering participation in a discounted bicycle rack purchase program. It is recommended that North Aurora participate and work agreements to install racks at the following locations, at least:


Recommended Pedestrian Plan

The earliest development in North Aurora did not include sidewalks, but sidewalks have been required with all development since then. Sidewalks not only encourage walking, but they also improve the safety of pedestrians. Streets without sidewalks have 2.6 times more pedestrian and automobile collisions than expected on the basis of exposure, while streets with sidewalks on only one side had 1.2 times more pedestrian crashes9.

Deterrents to walking include: missing sections of sidewalks, missing curb cuts, and difficult street crossings. On the other hand, continuous sidewalks, safe street crossings, pedestrian signs and signals, crosswalk markings, sidewalk setbacks, and street landscaping all encourage pedestrians. This plan makes prioritized recommendations for the elimination of impediments and the addition of encouragements to walking in the Village.

Sidewalks

The three maps of Figure 2 show the Village’s “Existing and Proposed Sidewalks.” Included in the maps are:

Table 2, with proposed sidewalks and their priority, appears below. Priority was assigned based on a number of factors:

In single-family residential areas, sidewalks of at least 4 feet are recommended5. Higher pedestrian use areas should have wider sidewalks – at least 5 feet along arterials and collectors, more if the sidewalk is relatively suitable for bicyclist use. A recommended source for sidewalk design issues is the Design and Safety of Pedestrian Facilities10.

Table 2 – Proposed Sidewalks with Priority

Priority

Streetname Sides From To

High

Banbury Rd both Oberweis Dr Sharon Ln

High

Butterfield Rd north Illinois 25 McKee Door

High

Illinois 25 east Dee Rd Butterfield Rd

Priority

Streetname Sides From To

High

Illinois 31 both State St Airport Rd

High

Illinois 31 east Airport Rd Riverview

High

Illinois 31 both Smoke Tree Sullivan Rd

High

Laurel Dr west north of Butterfield Trails apts  

High

Oak St south White Oak Dr NICor easement

High

Oak St south Summer Wind Randall Rd

High

Oak St north Randall Rd Juniper - 3 gaps

High

Oak St north Juniper Dr Timber Oaks

High

Oak St south Cherrytree Willow Way

High

Oak St both Willow Way Illinois 31

High

Banbury Rd east S of Oak Crest Oberweis Dr

Medium

Adams St both Oak St State St

Medium

Airport Rd north Alder Dr RR ROW

Medium

Alder Dr both Ice Cream Dr Airport Rd

Medium

Butterfield Rd north Woodland Lakes Laurel Dr

Medium

Butterfield Rd south Uncle Pat's Centex

Medium

Butterfield Rd both Village limits Hart/Mitchell

Medium

Dee Rd both Illinois 25 Linn Ct

Medium

Harmony Dr both Cherrytree Willow Way

Medium

Ice Cream Dr both Randall Rd Alder Dr

Medium

Illinois 25 east Ridge Rd Dee Rd

Medium

Illinois 31 both Mooseheart Rd Elm Av

Medium

Illinois 31 west Airport Rd I-88

Medium

Illinois 31 both I-88 Smoke Tree

Medium

Oak St north NICor easement Randall Rd

Medium

Randall Rd east Ice Cream Dr Oak St

Medium

Ridge Rd south Illinois 25 Banbury Rd

Medium

State St both Cherrytree Willow Way

Medium

Sullivan Rd both RR ROW Illinois 31

Low

Airport Rd north Randall Rd Alder Dr

Low

Banbury Rd east Spruce St Butterfield Rd

Low

Banbury Rd east Schneider Chestnut St

Low

Dee Rd south Laurel Dr Banbury Rd

Low

Hill Av both Long Av Dee Rd

Low

John St north Willow Way Illinois 31

Low

John St both Illinois 31 Fox River Trail

Low

Laurel Dr west Spruce St Butterfield Rd

Low

Lilac Ln both Dee Rd Woodland Lakes

Low

Overland Dr both Airport Rd Airport Rd

Low

Pine Creek Dr east Butterfield Rd Lindsay Cir

Low

Poplar Pl both north end Airport Rd

Low

Sharon Ln both Illinois 25 Banbury Rd

Low

State St south Roberts St Illinois 31

Low*

April Ln both Hill Av Laurel Dr

Low*

Briar Ln both Illinois 25 Hill Av
* - Increases to medium priority if Dee Road sidewalks are omitted, or for river trail access at Briar.


Intersections and Crosswalks

Intersection design is extremely important for the safety of pedestrians. Several features that guide pedestrians, improve their visibility, or reduce their crossing distances include:

Marked crosswalks should be provided at intersections with a significant number of pedestrians. Crosswalks channel pedestrian traffic through intersections, and heighten motorists’ awareness of possible pedestrian crossings. The Manual on Uniform Traffic Control Devices gives criteria for installing crosswalks, based on traffic and pedestrian volumes11. The MUTCD also provides design guidance and examples. High visibility designs are recommended, particularly for the higher priority crosswalks in the maps of Figure 3. Potential bicycle use increases the need for high visibility crosswalks. In addition to MUTCD suggestions, the Kane County Division of Transportation can be consulted for new techniques. Another idea, borrowed from sidewalk intersections with residential driveways, is to use cement sidewalks to cross asphalt commercial entrances. Besides increased visibility, it delivers the message that pedestrians belong and have the right-of-way.

The three maps of Figure 3 show the Village’s “Existing and Proposed Crosswalks.” Included in the maps are:

Those proposed crosswalks with “High” or “Highest” priority should use high visibility techniques. These are primary crossings for pedestrians and many Class B/C bicyclists, usually at arterials and collectors or near schools. Crosswalks with “Medium” or “Lower” priority are at lesser residential streets. Traditional, parallel stripes may be enough to accommodate these crossings, if crosswalks are implemented at all. Suggested crosswalks for proposed sidewalks are not shown on the map, but crosswalk decisions can be based on these same prioritization factors.

Other Pedestrian Facilities


Pedestrian refuge areas, like raised medians, can be important for large, multilane intersections. They allow a resting area for slower pedestrians to cross one direction of traffic at a time, if they cannot make it across the whole intersection in the time allotted. In this case, they can reduce the overall delay to motor vehicles. Intersections with crossing distances over 75 feet – like crossings of Randall

and Orchard - are prime candidates for pedestrian refuge areas. Additionally, refuges should be considered at major trail crossings, such as those specified for the proposed ComEd trail.

Midblock crossings should generally be discouraged unless any of these conditions apply:

A popular midblock crossing is anticipated at Butterfield, between the Butterfield Trails apartment complex and the new strip mall across the street. A pedestrian refuge is recommended there.

Grade-separated crossings are very expensive. They should only be considered at carefully selected locations where there is high pedestrian demand to cross an expressway or other high-speed or high-volume roadway. An overpass is recommended for the proposed ComEd trail crossing of Illinois 31, but this opportunistic improvement should be done as part of the roadway’s scheduled reconstruction. Eventually, overpasses may become justified to replace crossings at intersections, for the proposed ComEd trail at Randall and Orchard. A possible need could develop for an overpass of Orchard just west of White Oak, so the residential areas north of Orchard could access Fearn and Jewell schools.

Specific pedestrian concerns have been raised by the Village’s school principals. At Schneider School, problems exist for pedestrians crossing Banbury Road at arrival and departure time. Principal Cheng has recommended that parking be banned – and the curb painted yellow – on the east side of Banbury by the school. Also, appropriately timed flashing yellow lights are needed on the two school zone speed limit signs on Banbury. Additional enforcement would deter violators of this school speed zone and Banbury’s stop sign at Chestnut-Dee. The crosswalks at that intersection need to be re-painted and improved. Principal Brusak of Goodwin School has requested consideration of stop signs at key crossings of Cherrytree, and more visible school crossing signs (or flashing lights) for the designated Oak Street crossings at Sycamore and Juniper.


Trail Proposals

The “Existing Bicycle Conditions and Proposed Trails” maps (Figure 1) include footnote references along the proposed trails. Details of these trails are described here, referencing the map locations. Included are a suggested priority, time frame, and cost range for North Aurora’s anticipated contribution. An estimated trail project cost is $55/ft7, but certainly, other factors can reduce (or increase) this cost. When relevant, possible partnering agencies for the North Aurora sections are listed.

Far West Subdivision Trails

Medium priority, medium-range, no cost (paid by developers)

A series of trails and sidepaths are proposed for subdivisions currently being planned in the far western part of the city. On the east, this trail system would connect to a new park at White Oak Drive and West Mooseheart Road (A). The trail would cross Deerpath Road at an entrance to the proposed Wiseman-Hughes subdivision. It would connect to sidepaths within Neumann Homes’ Tanner Trails subdivision (B), currently under review. These sidepaths would connect to Tanner Road and also the western edge of the subdivision, not far from Lake Run and a potential “Mid-County Trail” being considered by the Kane County Forest Preserve District. Finally, it is recommended to reserve right-of-way between the northernmost road in Tanner Trails, on the western edge of the proposed retention pond, to Seavey Road (C). This link would allow bicyclists and walkers to access Seavey Road and a large Forest Preserve holding without using Deerpath Road, which has a poor bicycle suitability. Potential partners: developers, Batavia Park District, Fox Valley Park District

White Oak/NICOR corridor

Low priority, long-range, low cost (for the on-street alternative)

A NICOR easement runs from the ComEd easement to the north. The park districts of Batavia and (especially) Geneva are considering a possible trail along this right-of-way. If this occurs, then a connection to the proposed ComEd trail would be very desirable. However, due to the difficult crossings of Orchard Road and Oak Street (and the huge cost of bridges or tunnels), the on-street alternative of White Oak Drive is recommended – perhaps with a painted bike lane. To allow this possibility, a small right-of-way link from the easement to Cromwell Street (D) should be preserved during any future development. Any future stoplights installed at the White Oak intersections with Orchard and Oak should include pedestrian push-button and bicycle on-street activation, along with high-visibility crosswalks and appropriate signal timing. The connection to the ComEd trail is technically possible with one of two short links: south along the NICOR easement from Foxhill Lane (E); or from the end of Creekside Court, along the north and east edges of the retention pond (I). A short link could also be made to Hidden Creek Lane. Potential partners: None.

“Mid-County Trail” Connections

High priority, long-range, medium cost

The Forest Preserve District of Kane County is acquiring open space for a possible north-south “mid-county” greenway and trail system. Preliminary plans call for use of a re-constructed Deerpath Road bridge over I-88, and for acquisition of land near the western planning boundary for North Aurora. Connection to the proposed ComEd trail would be critical to link the Mid-County Trail with the Fox River Trail and the Illinois Prairie Path regional network. It is recommended that any North Aurora development along Deerpath (F) include a trail link from the Deerpath bridge to the ComEd easement. Also, it is recommended to protect the possibility of trail development along the ComEd easement from Deerpath west to Lake Run (G), as this section may become part of the Mid-County Trail. Potential partners: Developers, Kane County Forest Preserve District, Fox Valley Park District.

ComEd trail

Highest priority, medium to long-range, very high cost

The main recommendation of this plan is the development of a major east-west trail, roughly following the ComEd right-of-way across the entire North Aurora planning area. Such a trail would provide the best east-west route through the Fox Valley area, connecting the Mid-County Trail, the Fox River Trail, and potentially the Illinois Prairie Path’s Batavia Spur. Many accesses to North Aurora neighborhoods would make this a valuable transportation and recreation amenity for the Village. The intersection of the ComEd trail and the Fox River Trail, with the “trailhead” combined-use area recommended in the Route 31 revitalization plan, would be a major community focal point.

The ComEd right-of-way has a major crossing of Orchard Road at Orchard Gateway (H). It is recommended that the proposed stoplight at this intersection be designed to handle an adjacent trail crossing on its north side, including ped and bike activation, ped signals with sufficient timing, high-visibility crosswalks, a smaller turning radius from Orchard Gateway westbound to Orchard Road northbound, and possibly a pedestrian median area. The eventual solution for this trail crossing would be a bridge, which would be justified at this location.

East from Orchard Road, the trail is recommended to parallel Orchard Gateway – with an access to Hansen Blvd. – until the road turns southeast. The trail should then follow the ComEd right-of-way until it approaches Randall Road. The aforementioned linkages to Pinehill Drive (I) and Foxhill Lane (via the NICOR easement, E) provide access for far western subdivisions.

The trail should “detour” south to cross Randall Road at the new Ice Cream Drive signalized intersection (J), to be constructed in 2001. It is recommended to construct that intersection for a trail crossing on its north side, with the same techniques recommended for the Orchard Road crossing. East of Randall, the trail should return north to the ComEd right-of-way. The exact routing of the detour south to Ice Cream Drive will be affected by right-of-way and wetlands issues. Also, the trail on at least one side of Randall should be significantly offset from the road, to discourage mid-block crossings at the ComEd right-of-way. Eventually, it may be desired to build a bridge over Randall, further increasing safety and eliminating the extra distance of the detour to Ice Cream Drive.

Proceeding east, the trail should include short linkages to provide access to nearby neighborhoods, including the Courtyard Village West apartments (K), Walnut Drive (along an existing right-of-way, L), Schneider School and park (M), Cherrytree Court (N), and Willow Way – at an intersection with a proposed trail on the abandoned Burlington Northern right-of-way. Another connection should be made to the extension of Adams Street (O). Just to the east of this, the right-of-way elevation drops significantly to the river. The top of this slope would be an excellent, panoramic location for a viewing area, with benches and landscaping.

Teska Associates, Inc., the consultant agency planning re-vitalization of the Illinois 31 corridor, offers some recommendations in agreement with this plan. Teska recommends development of the ComEd trail, with a grade separation at Illinois 31, a mixed-use trailhead area between IL31 and the river, and connection to the Fox River Trail (P). The significant slope complicates the design. A bridge and gentle switchbacks may be the best treatment, but further study is needed.

A trail bridge is recommended between the Fox River Trail and Fox Valley Park District’s island park, north of the ComEd trail intersection, where the river is narrower (Q). This bridge would increase the popularity of both the island park and the proposed trailhead area. It would likely see heavy pedestrian traffic, so a widened bridge is recommended – similar to the newer, easternmost bridge in Batavia’s island park system. The trail should proceed to the southern tip of the island and a small bridge to the east bank, where some grading is needed to rise to the street level.

The trail is recommended to cross the railroad tracks and Illinois 25 along the north side of the Grant Street crossing (R). First, it should cross Grant Street at the ComEd right-of-way, north of Grant Street’s turn to the east. This minor mid-block crossing will be made safer if Grant Street becomes a one-way street, as has been proposed. Some grading is needed to bring the trail to the Grant Street crossing of the railroad tracks. The non-signalized crossing of Illinois 25 should include high-visibility crosswalks and warning signs (possibly with flashing lights) along the street.

After crossing Illinois 25, the trail should be routed to minimize impact on the existing developments along the road, then follow the ComEd easement east. Fences are recommended on the quarry side of the right-of-way. When the right-of-way turns south, the trail should continue east along Feltes Road. At the intersection of Feltes and Pine Creek Drive (S), the trail could take one of two routes, depending on a possible connection to the Illinois Prairie Path, through Aurora. If no IPP connection is possible, then the trail should use Pine Creek to an existing neighborhood east-west trail. If the trail becomes more regional, then it should continue along the old Feltes right-of-way to Mitchell Road, providing a buffer from the future development directly south.

Aurora or the Fox Valley Park District may have interest in continuing the trail (T) towards either the Illinois Prairie Path’s Batavia Spur or Aurora Branch. It is recommended that North Aurora work cooperatively with these agencies on this project. Such a connection would dramatically increase the regional significance of the ComEd trail, creating the best east-west trail from DuPage County’s trail system to future Kane County trails to the west. The Batavia Spur can be linked through mostly undeveloped land, although sidepaths along Corporate Drive may be used to take advantage of intersections with Church and Farnsworth Roads. An existing NICOR easement might be used.

Development of this whole trail would require partners including Fox Valley Park District, Kane County Forest Preserve District, Kane County Department of Transportation, Illinois Department of Transportation, and ComEd. The trail is recommended to be paved, especially from Orchard Road to Illinois 25. A 10-foot width is recommended to adhere to AASHTO and to accommodate ComEd service vehicles without crumbling the edges. The phasing of the project should be opportunistic, when possible:

Abandoned Burlington Northern Right-of-way trail

High priority, short-range, medium cost

The abandoned railroad right-of-way extends from Airport Road north through the village. Just north of Airport Road, it has been absorbed by an access road for a multi-unit industrial development. It is recommended to construct a paved, 10-foot wide, 0.3-mile trail from John Street to the northern end of the industrial driveway (U). The link, already used informally, would safely connect the west side of North Aurora with its industrial areas and possibly the Fox River Trail (Y). A lower priority extension of this trail could connect with a short bike/ped path over the right-of-way at State Street. A possible partner MIGHT include the Fox Valley Park District, especially if Erickson Mini-Park is expanded.

Currently, the railroad uses the right-of-way to a point just north of its bridge over the tollway. It is recommended to continue negotiations for purchase or use of this bridge for a trail connecting to the Smoke Tree Plaza area (V). Once over the tollway, the trail could leave the railroad right-of-way, paralleling it on the east to the road. Again, this segment is already used informally.

Miscellaneous Trail Links

(W) – A short sidewalk link is recommended from the Oak Street north sidewalk to the southeast corner of the adjacent strip mall, where a bicycle rack is also recommended. This is preferable to the main strip mall parking lot entrance, nearby to the west. Medium priority, short-range, low cost.

(X) – Another short sidewalk link access and bicycle rack is recommended between the Oak Street south sidewalk and the strip mall south of Oak Street. This could easily go in back of the car wash, to the northeast corner of the strip mall. Medium priority, short-range, low cost.

(Y) – As mentioned previously, when the parcels between the river and the Airport Road/Illinois 31 intersection are developed, a short trail or access to the Fox River Trail is recommended. High priority, short-range, low cost.

(Z) – A connection from Lovedale Lane to the Fox River Trail is very desirable, especially with the nearby commercial development and signalized intersection at Illinois 31. The availability of this right-of-way, and opposition to its use, are in question. An alternative is to use a link to Sullivan Road, Offutt Lane, and Lovedale Lane, possibly with signage at the trail. High priority, medium-range, low cost.

(AA) – Pedestrian and bicycle access from the near northeast neighborhoods to downtown and the Fox River Trail East is severely lacking. A trail link from either Dee Road or Briar Lane to the Fox River Trail is recommended. Dee Road makes more sense geographically, but difficulty in implementing sidewalks along Dee Road may necessitate the use of Briar Lane. Given the cost, the moderate traffic conditions of Illinois 25, and the right-of-way and engineering challenges, at-grade crossings of Illinois 25 and the railroad are recommended instead of a bridge or tunnel. AASHTO standards, including trail crossing signage and highly visible crosswalks, should be followed. A parallel descent to the railroad is needed, along with a new railroad crossing, grading of the berm immediately west of the tracks, and a slight descent to the trail through Fox Valley Park District land. Jeff Palmquist of FVPD has expressed preliminary interest in the trail, and would likely request his board to allow this connection by North Aurora. Highest priority, short-range, medium cost.

(BB) – It is recommended to either extend Hill Avenue to Ridge Road, or to construct a short trail segment there. Low priority, medium-range, low cost.

(CC) – It is also recommended to construct a short trail link between Ridge Road and Long Avenue at Laurel Drive. This link provides an alternative to the busier Banbury Road area, especially for school children traveling from the new Ridge Road townhomes to Schneider School. Currently a homeowner is using part of this right-of-way. High priority, medium-range, low-cost.

(DD) – It is recommended to construct a sidewalk or trail from April Lane/Court, through the reserved right-of-way easement, to the school property and park area. Again, this is part of an alternative route for school children going to Schneider School. It is recommended to build (at least) the segment on the narrow easement immediately, before home construction on April Court proceeds. High priority, short-range, low-cost.

(HH) – It is recommended to construct a sidepath along the west side of Mitchell Road from the new strip mall at Butterfield Road south to the new Chesterfield park on the east end of that subdivision. This sidepath should connect with the subdivision trail ending in that park. A link connecting the sidepath to the southeast part of the stripmall is recommended, with a bicycle rack there. Medium priority, medium-range, medium cost.

Illinois 25 trail

Low priority, long-range, high cost

The Fox River Trail East ends at State Street. South of State Street, homes and an industrial area prevent a riverside trail. While not a Fox Valley Park District priority at this time, an extension to the Fox River Trail East could be diverted to the land between the railroad and Illinois 25, from State Street to Clearwater Drive (GG). South of Grant Street, the trail would have to be brought closer to Illinois 25 because of a sloping elevation.

It is recommended to take opportunistic steps to preserve this possible trail corridor. If the Sperry industrial area becomes available, an access from the existing trail to the present Illinois 56 railroad crossing should be established (EE). If the Illinois 25/56 intersection is moved south, with an Illinois 56 underpass of the railroad, then the tunnel should be built to allow a trail crossing overhead (FF) just east of the tracks. (Assumed is that the present railroad crossing of Illinois 56 would become available for a trail crossing.) Construction of a Com Ed trail at Grant Street would increase the priority of the trail, from Grant Street to State Street. Possible partners: Illinois Department of Transportation, Fox Valley Park District.


Arterial and Collector Road Recommendations

Methodology

The following section looks at current bicycling conditions and needs for each major road in the Village’s planning area. Depending on these factors, priority is given for any recommended improvements, and specific facility types are suggested.

Some improvements can be opportunistic – to be done when the road is being expanded or redesigned anyway. This significantly reduces costs. Higher-priority projects should be more proactive, part of a dedicated capital improvement program. These include roads:

The recommended facility type generally depends on factors including:

When there is enough pedestrian or Class B bicyclist demand, sidepaths will be recommended for cases with a medium/high sidepath suitability and low/poor roadway suitability. The accompanying on-road facility should be either wide outside lanes or paved shoulders/bike lanes, depending on available right-of-way. For low Class B demand and/or unsuitable sidepath corridors, sidepaths will not be recommended for bicycles. Available right-of-way (or acquisition cost) again makes the determination between wide outside lanes or paved shoulders/bike lanes. For medium roadway suitability, wide outside lanes are sufficient. For high roadway suitability, no special bike facilities are needed.

Specific Road Recommendations

Butterfield Road is the most important road on the east side, so its sidewalk gaps and poor bicycle suitability present significant barriers to pedestrians and bicyclists. Recent, localized road modifications have added medium-width paved shoulders.

Highest Priority – Build 6-7 ft. sidewalks to close gaps on the north side, and create highly visible crosswalks, especially at Illinois 25, Woodland Lakes, and Pine Creek Drive. Include ped signals as part of the Illinois 25/56 project. Medium Priority – Build 6-7 ft. sidewalks on the south side, where missing from Uncle Pat’s to Mitchell Road. Opportunistic – Most of the Butterfield right-of-way is very wide, allowing for 5’ to 8’ paved shoulders if an expansion to four lanes is done. Include a raised pedestrian median between the apartment complex and new strip mall near Laurel Drive.

Hart/Mitchell Road has recently become more important with a new stoplight and strip mall at Butterfield. The road has low to poor roadway suitability and no sidewalks. Much of Hart Road is presently outside of North Aurora.

Medium Priority – Build an 8 ft paved sidepath along Mitchell from the new strip mall to the entrance to Chesterfield, connecting with the subdivision trail. If the old Feltes Road right-of-way is used for an east extension of the ComEd trail, then extend the sidepath to it. Opportunistic – As development occurs along the road, build 6 ft. sidewalks. If the road is reconstructed, add wide outside lanes or 5 ft. paved shoulders, depending on right-of-way.


Banbury Road mixes Schneider School traffic with traffic traveling to the northeast side, and from westbound Illinois 56 to northbound Illinois 25. Roadway suitability for bicycling is high to medium, but student pedestrian issues are important.

High Priority – Improve crosswalk visibility at the intersections near the school. Sidewalks need to be completed between Oberweis and Sharon. Add flashing yellow lights on the school zone warning signs north and south of Schneider. Medium Priority – Finish the sidewalk on the east side between Oak Crest and Oberweis. Low Priority – Finish the two east side sidewalk gaps between Sharon and Butterfield. Opportunistic – Where paved shoulder/turn lanes are missing between Sharon and Thornecrest, add 2 ft. of paved width.


Illinois 25 has low to poor roadway suitability and no sidewalks. The Fox River Trail parallels Illinois 25 north of Butterfield, but trail access is lacking. The near northeast side is severely lacking good bicycle and pedestrian access to downtown. Grant Street is a medium suitability road paralleling Illinois 25 south of Butterfield, but destinations along 25 are inaccessible from Grant Street.

Highest Priority – Build a short trail link between either Dee or Briar and the river trail. At-grade crossings of the railroad and Illinois 25 are appropriate. High Priority – Build sidewalks on the east side from Butterfield to Dee (or Briar). Medium Priority – Build sidewalks on the east side from Dee to Ridge. Low Priority – Build a paved sidepath between 25 and the railroad tracks from Butterfield to Grant, further if the Park District wants to continue an east river trail south into Aurora. Opportunistic – Reconstruction of 25 should include 4-5 ft. paved shoulders between Briar and Grant, 5-8’ paved shoulders between Grant and Mettel.


Illinois 31 is paralleled by the Fox River Trail, but many residences and businesses can not be accessed from the trail. Roadway suitability is low to poor. Sidewalks with low suitability exist between John and Elm on the east side, and between Oak and State on the west side. South of State, parking for the many businesses blurs the space for pedestrians. (Since major roadwork is already in the planning stages, “opportunistic” improvements will be given priorities.)

High Priority – Teska’s plan for the corridor reconstruction includes sidewalks, which are necessary for pedestrians. However, the abundance of residential and commercial driveways makes these sidewalks unsuitable for most bicycle travel – especially south of Oak. Five-foot bicycle lanes would be ideal here, but already there is a severe lack of right-of-way. Wide outside curb lanes are recommended, with a lane configuration of 11&13 ft. or 12&14 ft. Addition of a trail bridge at the ComEd right-of-way is recommended during road reconstruction. Pedestrian-activation is needed at the stoplights, especially at Airport Road and Lovedale Lane. Medium Priority – Construct 6 ft. sidewalks where missing north of Oak Street.


Sullivan Road has low roadway suitability and no sidewalks, west of Illinois 31. It provides unique access to many destinations to the west. East of 31, it is a minor connector street, with some unofficial accesses to the Fox River Trail. However, Aurora is planning to build a bridge there.

Medium Priority (with Aurora) – Build sidewalks west of 31. Opportunistic – Ensure that the bridge project positively affects the trail, with a grade separation and access from the trail to sidewalks and wide outside lanes along Sullivan.

Airport Road has medium roadway suitability and sidewalks only from Illinois 31 to the old railroad right-of-way. The road serves many industrial locations. Access to this area is now difficult, but a short trail connection between 31 and the Fox River Trail is possible.

High Priority – Improve the Airport Road and Illinois 31 intersection for a trail crossing on its north face. Include pedestrian activation and highly visible crosswalks. Medium Priority – Build 6-7 ft. sidewalks on the north side of Airport from the old railroad right-of-way to Alder. Opportunistic – Wider outside lanes (1 or 2 ft. more) are recommended with any roadwork.

State Street between Illinois 25 and 31 is the only river crossing in town and thus a vital corridor. Sidewalks are heavily used by cyclists and pedestrians, especially on the north side of the bridge, between the trails on each side of the river. Suitable paved shoulders exist on the bridge and east to Grant. West of the bridge, the road has three lanes and a low suitability for bicycles. Shoulders exist on the north side (only), but they are interrupted by pedestrian curb bulbs. Bicyclists and pedestrians crossing the State/31 intersection – especially the east and north faces – must contend with a very high volume of turning traffic. This is the primary crossing of 31 through town – a hazard for all non-motorized travel to the west.

Highest Priority – Create high visibility zebra-style crosswalks at the State/31 intersection and other intersections between 31 and Grant. Consider moving the north face crossing of State/31 closer to State. Consider adding a pedestrian-only phase to the stoplight timing, with ped-activation. Also, taper the sidewalk bend just east of the bridge, as described in Spot Improvement #6. High Priority – Paint crosswalks at the State/Adams intersection and the Willow Way crossing at the trail link extension of State. This is a significant east-west non-motorized route, an alternative to Oak Street. Opportunistic – Physical constraints may prevent this, but consider adding 4-5 ft. bike lanes if State is ever reconstructed from the bridge to 31 – especially if a separate pedestrian signal phase is ruled out at State/31. Make sure to follow AASHTO’s recommendations on lane striping as State approaches 31, to reduce conflict with right-turning traffic.

Oak Street is North Aurora’s main arterial on the west side. Oak has low roadway suitability east of Randall. Sidewalks on this stretch have low to poor suitability for bicycles, mostly due to gaps and unmarked crosswalks. East of Cypress, Oak’s frontage road and State provide alternatives for east-west travel, but accessing Timber Oaks, the new library site, and other destinations is a problem. West of Randall, Oak has suitable paved shoulders except on the far west, and eastbound approaching Randall. Finishing sidewalk gaps and creating visible crosswalks would result in highly suitable sidepaths. The eastbound gap near Randall is a problem, and the intersection needs crosswalks.

Highest Priority – Build 6-7 ft. sidewalks at the gaps on the north side near Juniper, Acorn, and east of Randall. Build a 6-8 ft. sidewalk to close the south side gap between Hidden Creek and Randall. Create highly visible zebra-style crosswalks at all intersections – including retail entrances near Randall. High Priority – Build missing sidewalk gaps between Juniper and Illinois 31, possibly as part of the upcoming Oak Street continuous-left turn lane project. Build a 6-8 ft. sidewalk from the Hidden Creek subdivision to White Oak. Add pedestrian signals to the Oak/Randall stoplights. Add paved shoulder at the short, eastbound gap approaching Randall. Medium Priority – Build a 6-8 ft. sidewalk on the north side west from Randall to the existing sidewalk. Opportunistic – Maintain the paved shoulders if Oak is expanded. When Oak is re-routed to meet Tanner, include paved shoulders and sidewalks, like the current cross-section at White Oak. Add wide curb lanes or paved shoulders during the left-turn lane project east of Randall.


Mooseheart Road has low roadway suitability except for suitable paved shoulders just east of Randall. There are no sidewalks and few destinations. There is an interesting potential to connect the Fox River Trail and Randall/Orchard via Mooseheart Road. Most of the road is currently outside Village limits.

Opportunistic – If Mooseheart is reconstructed and the adjacent land is developed, a continuation of the paved shoulders would be appropriate, and sidewalks should be added.


Randall Road has suitable paved shoulders – except for rumble strips near Randall – from the Courtyard Apartments to the north. South of that, the road has poor suitability. Sidewalks exist only near new development at the southeast corner of Oak/Randall.

Highest Priority – Include pedestrian signals with ped-activation and possibly a pedestrian-only phase with the upcoming Randall/Ice Cream drive intersection reconfiguration. This will serve the future ComEd trail, recommended to cross at the north face of the intersection. Medium Priority – Finish the east side sidewalk – with highly visible crosswalks – from Oak to Ice Cream Drive. Low Priority – Remove rumble strips near the Oak/Randall intersection. Opportunistic – Maintain paved shoulders during any expansion. If Randall is expanded over the tollway, add 8 ft. paved shoulders on the ample right-of-way.

Orchard Road has suitable paved shoulders over its entire length. Currently, no sidewalk/sidepath exists. These are not a priority until development, likely commercial, occurs along Orchard.

High Priority – Create highly visible crosswalks at White Oak, adding a pedestrian signal and activation. Opportunistic – When a stoplight is added at Orchard Gateway, include highly visible crosswalks, ped signal and activation, and possibly a raised median refuge, especially on the intersection’s north face. This will serve the future ComEd trail, recommended to cross at the north face of the intersection. Include crosswalks, ped signal and activation at each future stoplight. Preserve the paved shoulder, including the shoulders at intersection approaches.

Deerpath Road has low roadway suitability south of Oak, poor suitability north of Oak, and no sidewalks. Alternative routes include Orchard’s shoulders to the south and White Oak/Hickory to the north.

Opportunistic – Paved sidepaths would have a high suitability here. A possible tollway bridge reconstruction project should accommodate the future “Mid-County Trail” with paved shoulders, at least, and possibly barrier walls.

Tanner Road has low roadway suitability due to traffic speed and moderate volume. Tanner becomes more important with the upcoming Neumann homes development and re-routing of Oak to meet Tanner.

Opportunistic – A cross section similar to Oak Street (west of Randall) is recommended as the ideal solution, especially with available right-of-way.

Orchard Gateway (new) – Both this road and the proposed ComEd trail will connect the auto mall to the Randall Road/Ice Cream Drive intersection.

Opportunistic – Sidewalks and possibly a 13’ outside curb lane would be sufficient to access local destinations along this road.


Funding Opportunities

There are currently three major funding sources for the construction of bicycle and pedestrian facilities. Other funding sources are possible for both pedestrian and bicycle improvements7.

Illinois Transportation Enhancement Program (ITEP)

This program provides grants to public agencies for projects that serve a transportation need. “Provision of facilities for bicycles and pedestrians” is one of ten broad categories eligible for the 80% federal contribution and 20% local match. The Illinois Department of Transportation administers this program, which has recently averaged $20 million annually – over half typically going to bike/ped projects. State and federal guidelines must be followed during design and construction. Many communities have had difficulties in meeting these standards, and long approval delays have been common. The program has already allocated funds through Fiscal Year 2003. Continuation of the program after that time is dependent on reauthorization of the TEA-21 federal transportation bill.

Congestion Mitigation and Air Quality (CMAQ)

This program is another 80% federally-funded program as part of TEA-21, but funds are still available for annual funding cycles. The program is administered through IDOT with the Chicago Area Transportation Study (CATS) performing technical analysis. It provides grants to agencies for projects that will lead to quantifiable reductions in auto emissions and/or traffic congestion. Like ITEP, bike/ped projects compete with other categories. In addition to trails and bike lanes, a bike rack program is currently being funded regionally, through CMAQ.

Illinois Bicycle Path Grant Program

This program, funded by the Illinois Department of Natural Resources, provides grants to agencies for off-road bicycle trail construction and right-of-way acquisition costs. Annual funding has averaged $3-4 million, with a proposal deadline of March 1. The state reimburses 50% of engineering and construction costs, up to a state share maximum of $200,000. Because of the popularity of the program, IDNR has been restricting their project approvals to those projects that would extend or complete missing links in a major off-road bicycle path. The required design standards and approval process are considerably simpler than the federal programs.

Other Sources

There are other options available for funding projects with bicycle and pedestrian components. Kane County Council of Mayors administers the federal Surface Transportation Program for road construction costs, and the Traffic Control Measure program for traffic signals and safety items. The state-allocated Motor Fuel Tax funds can be used for pavement striping or repairs and standard MUTCD signage. Also, there are developer contributions, riverboat funds, Congressional discretionary spending, and partnerships with other agencies, including the Fox Valley Park District and the Kane County Forest Preserve District. Finally, Village general funds can finance portions of the program, including local matches for the grants listed above. An annual bike/ped capital improvement budget is recommended to implement this plan using its suggested priorities.


Questions for review of roadwork and developments

The following lists of questions summarize many of the points of this plan, and can be used as a guide to ensure that new development and roadwork encourage non-motorized transportation.

Residential Developments

Commercial Developments

Road Projects


Appendix A – Road Suitability for Bicycles

The following chart rates a road’s suitability for bicycle travel12. In addition to rating existing roads, it can be used as a planning tool during the design of road projects. Developed by the Chicagoland Bicycle Federation (CBF) for its regional bicycle map, the CBF measure closely resembles other national measures of road suitability. It is based on three variables:

  1. Traffic speed – measured by the posted speed limit.
  2. Traffic volume – measured by ADT (Average Daily Traffic) per lane.
  3. Width of outside lane – measured by the lane width, plus any paved shoulder width (free of rumble strips) under 4 feet. Roads with paved shoulders with width of 4 feet or more are specially marked on this plan’s maps.

The chart details three levels of suitability. The colors are related to suitability level by:

Color Suitability

Green High suitability

Yellow Medium suitability

Red Lower suitability

Black Not recommended (poor)

Roadway Suitability for Bicycle Travel

  Very Low ADT/lane Low ADT/lane Medium ADT/lane High ADT/lane
  (under 500) (500-1250) (1250-5000) (above 5000)
30 mph & under All widths = green All widths = green 12' or more = green 12' or more = yellow
Speed Limit     <12' = yellow <12' = red
         
35 - 40 mph All widths = green 12' or more = green 12' or more = yellow 12' or more = red
Speed Limit   <12' = yellow <12' = red <12' = Not recommended
         
45 - 50 mph 12' or more = green 14' or more = green 14' or more = yellow 14' or more = red
Speed Limit <12' = yellow 12-13' = yellow 13' = red <14' = Not recommended
    <12' = red <13' = Not recommended  
         
55 mph 12' or more = green 14' or more = green 14' or more = red Not recommended,
Speed Limit <12' = yellow 12-13' = yellow <14' = Not recommended without paved shoulders
    <12' = red    

Any paved shoulder width less than 4 feet is added to the lane width. Roads with paved shoulders with width of 4 feet or more are specially marked.


Appendix B – Sidepath Suitability Algorithm

The following algorithm rates the suitability of a sidewalk or sidepath as a bicycle facility. (A sidepath is a trail parallel to, but separated from, a roadway) In addition to rating existing sidepaths, it can be used to plan safety improvements for new or existing sidepaths. At present, no such nationally-accepted suitability index exists. This algorithm was developed using design issues described in the AASHTO Guide for the Development of Bicycle Facilities.

The factors considered are: intersection traffic, continuity, curb cuts, pedestrian use, crosswalks, and path/road separation at intersections. For a particular segment, add the following terms:

  1. Intersection Traffic Score. The volume and speed of motor vehicular traffic – especially turning traffic – directly affect the risk of collision. Determine the intersection traffic score X from the following:

X = [R+(2*A)+(4*B)] / M * [Spd*Vol];

Where:

R = Number of residential intersections (driveways) on the segment,

A = Number of minor commercial intersections and streets (<1000 ADT),

B = Number of major commercial intersections and streets (>1000 ADT),

M = Length of segment in miles

Spd = Speed limit factor, for the parallel street: 0-30 mph = 1, 35-40 mph = 2, 45+ mph = 3.

Vol = Traffic volume factor, parallel street: <2,000 ADT = 1; 2,000-10,000 = 2; >10,000 = 3.

Add the following number of points for the intersection traffic score X.

X Points

  1. 0
    1. 1
    2. 2
    3. 3
    4. 4
    5. 5

201-240 6

>240 7

  1. Continuity. Discontinuities (major gaps, or sidepath ends) may force cyclists to ride through grass, etc., and enter the roadway awkwardly. Cyclists will often avoid sidepaths with these gaps. Add 4 points if major discontinuities exist.
  1. Curb cuts. Uncut curbs compromise cyclist movement and attention at intersections. Add 3 points if any intersections are lacking curb cuts.
  1. Pedestrian use. Sidewalks and sidepaths are used by both bicyclists and pedestrians. Insufficient width increases user conflict. (However, extra width encourages higher cyclist speeds – which becomes a problem at incorrectly-designed intersections.) Add points according to the following chart:

Low (rare) ped use Medium (sometimes) ped use High (often) ped use

<= 5’ - 1 point <=5’ - 2 points <=5’ - 4 points

> 5’ - 0 points 6-7’ - 1 point 6-7’ - 2 points

>=8’ - 0 points >=8’ - 1 point

  1. Crosswalks. Visible crosswalks can help make motorists more aware of non-motorized traffic. Sometimes two parallel painted stripes are sufficient. At busier intersections, “ladder” or “zebra”crosswalks and other techniques enhance visibility. Add 2 points if there are no crosswalks. Add 1 point if there are some crosswalk markings, but more visibility is warranted for that intersection type. Add 0 points for appropriately marked crossings. Take the worst-case crossing for the segment.
  1. Intersection sidepath/road separation. AASHTO recommends that sidepaths be brought closer to the parallel road at intersections, so motorists more easily see and consider bicyclists during their approaches. The vehicular stop line should be in back of the sidepath crossing – cyclists must not weave through stopped traffic when crossing. Add 5 points if the crossing goes through stopped traffic. Add 3 points if the crossing is not brought “close enough” to the parallel road. Add 1 point when the crossing is brought close to the road. (Paved shoulders and bike lane crossings – 0 points.) Again, take the worst-case crossing for the segment.

Add together all the points for the sidepath suitability score. Ranges of suitability are:

Suitability Score Suitability Color on Map

<= 7 High suitability Green

8-9 Medium suitability Yellow

10-11 Low suitability Red

>= 12 Not suitable (poor) Black


References

1) Research Triangle Institute, “National Personal Transportation Survey, User’s Guide to the Public Use Tapes,” FHWA Report No. FHWA-PL-92-007 (Research Triangle Park, NC: U.S. DOT, FHWA, 1990)

2) W.C Wilkinson and others, “Selecting Roadway Design Treatments to Accommodate Bicycles,” FHWA Report No. FHWA-RD-82-073 (Washington, D.C.: U.S. DOT, FHWA, 1994)

3) American Association of State Highway and Transportation Officials, Guide for the Development of Bicycle Facilities (Washington, D.C.: AASHTO, 1999).

4) Illinois Department of Transportation, “IDOT BDE Procedure Memorandum 95-21: Policies and Procedures for Accommodating Bicycle Travel in Highway Improvements” (Springfield, IL: 1995)

5) Jennifer Toole and Bettina Zimny, “Bicycle and Pedestrian Facilities,” Chapter 16, Transportation Planning Handbook